|
Last Modified: 11-29-2007 |
1.6 C |
|
Service Category: Vehicle Exterior |
Section: Sliding Roof/Convertible |
|
Model Year: 2008 |
Model: Sequoia |
Doc ID: RM0000029GH019X |
|
Title: SLIDING ROOF / CONVERTIBLE: SLIDING ROOF SYSTEM: DESCRIPTION (2008 Sequoia) |
DESCRIPTION
This DTC is stored when the sliding roof drive gear (sliding roof ECU) detects that the SLIDE or TILT switch in the roof console box (sliding roof switch) is stuck for 30 seconds or more.
|
DTC Code
|
DTC Detection Condition
|
Trouble Area
|
|
B2342
|
Sliding roof drive gear (sliding roof ECU) detects that SLIDE or TILT switch in roof console box is stuck for 30 seconds or more.
|
-
Sliding roof switch
-
Roof console box
-
Harness and connector
-
Sliding roof drive gear (Sliding roof ECU)
|
WIRING DIAGRAM
INSPECTION PROCEDURE
PROCEDURE
(a) Clear the DTCs
.
(b) Check for DTCs
.
Result
|
Result
|
Proceed to
|
|
DTC B2342 is output
|
A
|
|
No DTC is output
|
B
|
| A |
|
|
|
2.
|
READ VALUE USING TECHSTREAM (SWITCH STATUS)
|
(a) Connect the Techstream to the DLC3.
(b) Turn the ignition switch to ON.
(c) Turn the Techstream ON.
(d) Enter the following menus: Body Electrical / Sliding Roof / Data List.
(e) According to the display on the Techstream, read the Data List.
Sliding Roof
|
Tester Display
|
Measurement Item/Range
|
Normal Condition
|
Diagnostic Note
|
|
Open Switch Failure (Past)
|
Open switch failure signal (Past)/Fail or Not Fail
|
Fail: Sliding roof tilt open signal failure (Past)
Not Fail: Sliding roof tilt open signal not fail (Past)
|
-
|
|
Close Switch Failure (Past)
|
Close switch failure signal (Past)/Fail or Not Fail
|
Fail: Sliding roof tilt close signal failure (Past)
Not Fail: Sliding roof tilt close signal not fail (Past)
|
-
|
|
Up Switch Failure (Past)
|
Up switch failure signal (Past)/Fail or Not Fail
|
Fail: Sliding roof tilt up signal failure (Past)
Not Fail: Sliding roof tilt up signal not fail (Past)
|
-
|
|
Down Switch Failure (Past)
|
Down switch failure signal (Past)/Fail or Not Fail
|
Fail: Sliding roof tilt down signal failure (Past)
Not Fail: Sliding roof tilt down signal not fail (Past)
|
-
|
|
Open Switch Failure (Current)
|
Open switch failure signal (Current)/Fail or Not Fail
|
Fail: Sliding roof tilt open signal failure (Current)
Not Fail: Sliding roof tilt open signal not fail (Current)
|
-
|
|
Close Switch Failure (Current)
|
Close switch failure signal (Current)/Fail or Not Fail
|
Fail: Sliding roof tilt close signal failure (Current)
Not Fail: Sliding roof tilt close signal not fail (Current)
|
-
|
|
Up Switch Failure (Current)
|
Up switch failure signal (Current)/Fail or Not Fail
|
Fail: Sliding roof tilt up signal failure (Current)
Not Fail: Sliding roof tilt up signal not fail (Current)
|
-
|
|
Down Switch Failure (Current)
|
Down switch failure signal (Current)/Fail or Not Fail
|
Fail: Sliding roof tilt down signal failure (Current)
Not Fail: Sliding roof tilt down signal not fail (Current)
|
-
|
OK:
The Techstream displays as shown in the table according to the operation of each switch.
| OK |
|
|
|
3.
|
INSPECT SLIDING ROOF SWITCH
|
|
(a) Remove the sliding roof switch
.
|
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
|
Tester Connection
|
Switch Condition
|
Specified Condition
|
|
1 (UP) - 5 (E)
|
TILT switch is pressed to up
|
Below 1 Ω
|
|
TILT switch is not pressed to up
|
10 kΩ or higher
|
|
2 (DWN) - 5 (E)
|
TILT switch is pressed to down
|
Below 1 Ω
|
|
TILT switch is not pressed to down
|
10 kΩ or higher
|
|
3 (CLS) - 5 (E)
|
SLIDE switch is pressed to close
|
Below 1 Ω
|
|
SLIDE switch is not pressed to close
|
10 kΩ or higher
|
|
4 (OPN) - 5 (E)
|
SLIDE switch is pressed to open
|
Below 1 Ω
|
|
SLIDE switch is not pressed to open
|
10 kΩ or higher
|
| OK |
|
|
|
4.
|
INSPECT ROOF CONSOLE BOX ASSEMBLY
|
(a) Remove the roof console box with sliding roof switch
.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
|
Tester Connection
|
Switch Condition
|
Specified Condition
|
|
3 (CLS) - 7 (E)
|
SLIDE switch is pressed to close
|
Below 1 Ω
|
|
SLIDE switch is not pressed to close
|
10 kΩ or higher
|
|
4 (OPN) - 7 (E)
|
SLIDE switch is pressed to open
|
Below 1 Ω
|
|
SLIDE switch is not pressed to open
|
10 kΩ or higher
|
|
5 (DOWN) - 7 (E)
|
TILT switch is pressed to down
|
Below 1 Ω
|
|
TILT switch is not pressed to down
|
10 kΩ or higher
|
|
6 (UP) - 7 (E)
|
TILT switch is pressed to up
|
Below 1 Ω
|
|
TILT switch is not pressed to up
|
10 kΩ or higher
|
| OK |
|
|
|
5.
|
CHECK HARNESS AND CONNECTOR (ROOF CONSOLE BOX - SLIDING ROOF ECU AND BODY GROUND)
|
(a) Disconnect the U3 ECU connector.
(b) Disconnect the U7 roof console box connector.
(c) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
|
Tester Connection
|
Condition
|
Specified Condition
|
|
U7-3 (CLS) - U3-7 (CLS)
|
Always
|
Below 1 Ω
|
|
U7-3 (CLS) - Body ground
|
Always
|
10 kΩ or higher
|
|
U7-4 (OPN) - U3-6 (OPN)
|
Always
|
Below 1 Ω
|
|
U7-4 (OPN) - Body ground
|
Always
|
10 kΩ or higher
|
|
U7-5 (DOWN) - U3-2 (DWN)
|
Always
|
Below 1 Ω
|
|
U7-5 (DOWN) - Body ground
|
Always
|
10 kΩ or higher
|
|
U7-6 (UP) - U3-1 (UP)
|
Always
|
Below 1 Ω
|
|
U7-6 (UP) - Body ground
|
Always
|
10 kΩ or higher
|
|
U7-7 (E) - Body ground
|
Always
|
Below 1 Ω
|
| OK |
|
|
|